Why completion of a paused (non-renewable) service instance returns Failed, but it is completed

Why does the suspension of a suspended (non-renewable) instance of a service instance stop, but is it completed?

Using the Microsoft.BizTalk.Operations BizTalkOperations.TerminateInstance () in the โ€œSuspended (Resume)โ€ and โ€œSuspended (Non-Resume)โ€ instance (routing error report)

Return Check Microsoft.BizTalk.Operations.CompletionStatus, paused - "Success", but a suspended non-renewable returns "Failed"

However, when I check the BizTalk Admin and / or BizTalkOperations.GetServiceInstances (), both instances are gone!

So what is going on here?

+2
source share
1 answer

An optional instance is typically associated with its renewable instance. You should have terminated the suspended (renewable) instance before its corresponding suspended (non-renewable) instance, as a result of which you will receive a refusal to renew, because it was terminated as part of the renewable instance. This is the same behavior as in the admin console.

+2
source

All Articles