In JIRA v7.0.10
When Im on the backlog screen, I can see the estimated points of the history of the started sprint , even if I switch them. (Green circles) But we still have planned sprints , where the plot points are not visible when switching this sprint. (Red circles)
How can I configure Jira to show story points on non-running sprints?

This is still not resolved properly.
source
share